Ticket Number Company Country Date and Time Priority Site Code User Notes Requestor
SFR-00009256 Meta 2025-01-17 14:06:00 LOW SIN2 Start Date: 2025-01-21 09:00 End Date: 2025-01-21 17:00 Nisa Mohd
SFR-00009255 Meta 2025-01-17 13:39:00 LOW SIN9 Eli Felzien
SFR-00009254 Meta 2025-01-16 22:18:00 LOW SIN7 Start Date: 2025-01-17 09:00 End Date: 2025-01-17 17:00 Antonio Alves
SFR-00009253 Meta 2025-01-16 17:08:00 HIGH KUL2 Start Date: 2025-01-16 17:40 End Date: 2025-01-16 18:40 Joseph O'Donnell
SFR-00009252 Meta 2025-01-16 16:55:00 LOW KUL2 Start Date: 2025-01-17 09:00 End Date: 2025-01-17 10:00 Padraic Egan
SFR-00009251 Meta 2025-01-16 14:35:00 LOW KUL3 Chao Yong Leong
SFR-00009250 Meta 2025-01-16 12:34:00 LOW AKL1 SOW: Before proceeding with activity, please contact Nadhirah, +65 86611106 SH is to confirm if the new racks from HPE are pre-populated with air-baffles (pizza boxes). -Racks & Footprints: Cage: ATCL3-CAGE3 Racks: 102, 103, 104, 202, 203, 204 (6 racks in total) Nadhirah
SFR-00009249 Meta 2025-01-16 12:34:00 LOW SIN9 Start Date: 17 Jan 2025 End Date: 17 Jan 2025 Time: 11:00am-12:00pm Nadhirah
SFR-00009248 Meta 2025-01-16 11:04:00 LOW GMP1 Start Date: 17 Jan 2025 End Date: 17 Jan 2025 Time: 9:00am-12:00pm LT Requestor: Akiyoshi, +81 9049151811 Akiyoshi
SFR-00009237 Meta 2025-01-15 14:46:00 HIGH KUL3 SOW: Before proceeding with activity, please contact engineer Vincenz +63-9178585323. Refer to the attached file KUL3_SH.xlsx. Prelay new cable from Existing A-Port to New Z-Port. Leave hanging first. Label for easy identification. Once all prelay are done, on our go signal, disconnect the Existing A-Port Existing Z-Port cable. Connect the new prelaid Existing A-Port New Z-Port. Activity is complete once all links are up/clean. Vincenz