Ticket Number Company Country Date and Time Priority Type of Service Site Code User Notes
SFR-00009695 Meta Singapore 2025-04-22 14:35:00 HIGH SIN10 Zul Start Date: 2025-04-23 09:00
End Date: 2025-04-23 17:00
SFR-00009694 Meta Malaysia 2025-04-22 16:28:00 LOW KUL2 Nabil SOW
1) SH to collect power cable from colo using inbound SR-041551
2) SH to migrate device power in Goalpost 4, 6, 8 to compliance rack R303 R304
3) SH to update power cable labels
SFR-00009693 Meta Singapore 2025-04-22 10:27:00 LOW SIN10 Syima Start Date: 2025-04-23 09:00
End Date: 2025-04-23 17:00
SFR-00009692 Meta Taiwan 2025-04-21 19:01:00 LOW TPE5 Nabil Details of Request: Before starting any onsite activity, the attending engineer should call ENS OPS NETWORK BREAKFIX on +1 6503087200 option 1 and mention the Meta reference number associated to each scope of works to work together with a Meta engineer.

Scope of work:
Scope of Work #1: Troubleshoot Network Equipment
Link down between gsw02.tpe5:Ethernet3/24/1 | msw1bz.50.tpe5:HundredGigE0/0/0/1, work with META Engineers to fix it.


Meta reference number: nwt20549973
SFR-00009691 Meta Singapore 2025-04-21 15:37:00 LOW SIN2 Nabil Scope Of Work: Kindly reach out to Requestor before starting any work Vincenz Nino Almanzor @+63 917 858 5323
*If we could complete all prelay quick, then we'll do the hot cut the same day. Otherwise, prelay on the first day, then hot cut on the second day.

1. Claim package Order#3662468/Shq#431176 (Inbound:REQ0506249-RITM0518554). This contains all required cables.
2. Refer to the file XSP1_MPOR_801-802-803.xlsx for the portmap.
3. Prelay new cable from Existing Metro Port --> New BB Port. Leave the cables hanging first.
4. Once prelay done, we'll hotcut in three batches.
5. At Existing Metro Port, disconnect old cable then connect the new cable.
6. At Existing BB Port, disconnect old cable then get the SFP.
7. At New BB Port, insert the SFP then connect the new cable.
8. Once all links on current batch are up, we'll repeat steps 5-8 for the next batch.
9. Once all batches are up on the New BB Port, print and attach new cable labels showing Existing Metro Port --> New BB Port.
10. Clean-up/remove the old cables Existing Metro Port --> Existing BB Port.
SFR-00009690 Meta Hong Kong 2025-04-21 13:56:00 LOW HKG4 Syima META Ref#T221833347 | Loc: HKG4 - 23 Apr migrate power cable to goalpost
SFR-00009689 Meta Singapore 2025-04-21 13:47:00 HIGH SIN6 Syima Date and Time (Site Local Time): 2025-04-22 10:00 AM
SFR-00009688 Meta Singapore 2025-04-21 12:02:00 LOW SIN11 Syima Date and Time (Site Local Time): 2025-04-23 9:00 AM
SFR-00009687 Meta Singapore 2025-04-21 10:56:00 LOW SIN6 Syima Start Date : [2025-04-22]
Start Time : [10:00 AM]
End Date : [2025-04-22]
End Time : [6:00 PM]
SFR-00009686 IX Telecom Singapore 2025-04-20 13:55:00 HIGH Acasia Anis Partner Circuit ID : MS00548


Date : TBC


Time : TBC


Site Address : Woodlands Checkpoint Singapore ,21 Woodlands Crossing, Singapore 738203