| Ticket Number | Company | Country | Date and Time | Priority | Site Code | User | Notes | Requestor |
|---|---|---|---|---|---|---|---|---|
| SFR-00009307 | Meta | Australia | 2025-01-29 03:09:00 | LOW | SYD2 | Muhammad Syafiq | Start Date: 2025-01-31 14:00 End Date: 2025-01-31 16:00 | Eli Felzien |
| SFR-00009306 | Meta | Malaysia | 2025-01-28 23:01:00 | LOW | KUL3 | Anis | Ali Najaf Gardezi | |
| SFR-00009305 | Meta | Singapore | 2025-01-28 17:00:00 | LOW | SIN1 | Anis | Start Date: 2025-01-31 10:00 End Date: 2025-01-31 12:00 | Szilard Povisel |
| SFR-00009304 | Meta | Malaysia | 2025-01-28 10:14:00 | HIGH | KUL3 | Muhammad Syafiq | Start Date: 29 Jan 2025 End Date: 29 Jan 2025 Time: 09:00am-05:00pm local time Requestor: Vincenz, +63 9178585323 SOW: Before proceeding with activity, please contact engineer Vincenz, +63 9178585323 -SH to refer to the attached file kul3_mesh_SH.xlsx. -Claim the package, this contains all required materials: Order # 3511519 / Shreq # 404298 - Delivered on 27 Jan 2025 Inbound: SRF920237 1. Prelay from OLD_A to NEW_Z. Leave hanging first. 2. On our go signal, disconnect existing cable OLD_A OLD_Z. 3. Patch the new prelaid cables OLD_A NEW_Z. We'll confirm if the links went up. 4. Print/attach updated cable labels. | nadbinte@meta.com |
| SFR-00009303 | Meta | Malaysia | 2025-01-28 10:11:00 | HIGH | KUL2 | Muhammad Syafiq | Start Date: 29 Jan 2025 End Date: 29 Jan 2025 Time: 09:00am-05:00pm local time Requestor: Vincenz, +63 9178585323 SOW: Before proceeding with activity, please contact engineer Vincenz, +63 9178585323 -SH to refer to the attached file kul2_mesh_SH.xlsx. -Claim the package, this contains all required materials: Order # 3511518 / Shreq # 404296 - Delivered on 27 Jan 2025 Inbound: SR-040817 1. Prelay from OLD_A to NEW_Z. Leave hanging first. 2. On our go signal, disconnect existing cable OLD_A OLD_Z. 3. Patch the new prelaid cables OLD_A NEW_Z. We'll confirm if the links went up. 4. Print/attach updated cable labels. | Nadhirah Binte Mohd Rapi |
| SFR-00009302 | Meta | Singapore | 2025-01-27 23:09:00 | HIGH | SIN1 | Anis | Start Date: 2025-01-28 09:00 End Date: 2025-01-28 17:00 | Padraic Egan |
| SFR-00009301 | Meta | Singapore | 2025-01-27 22:50:00 | HIGH | SIN1 | Anis | Start Date: 2025-01-28 09:00 End Date: 2025-01-28 17:00 | Padraic Egan |
| SFR-00009300 | Meta | Philippines | 2025-01-27 16:10:00 | HIGH | ap-ph-prin | Anis | Start Date: 2025-01-28 10:00 End Date: 2025-01-28 17:00 | Hamish Jude Patrick |
| SFR-00009299 | Meta | Singapore | 2025-01-27 12:31:00 | HIGH | SIN6 | Muhammad Syafiq | Start Date: 28 Jan 2025 End Date: 28 Jan 2025 Time: 10:00am-02:00pm local time Requestor: See, +65 81390726 SOW: Before proceeding with activity, please contact engineer See, +65 81390726. SH to asssist with power restripe for psw01.sin6 and psw02.sin6 Update power cable labelling for psw01.sin6 and psw02.sin6 | Nadhirah Binte Mohd Rapi |
| SFR-00009298 | Meta | Hong Kong | 2025-01-27 11:48:00 | HIGH | HKG5 | Muhammad Syafiq | Start Date: 2025-01-28 09:00 End Date: 2025-01-28 10:00 | Kannan Venkatesan |